تكاليف إعادة العمل وتصحيح التصميم (Rework & Design Correction Costs)

2 verified sources

Definition

Accessibility audits performed late in design or construction phases reveal non-compliant features (signage contrast ratios, wayfinding, physical dimensions, material selections). Correcting these issues post-design incurs high costs: design revision (50–200 hours), material re-specification, construction rework (if already started), and schedule delays. Manual audit processes (site visits, measurement, manual report generation) extend detection cycles, compressing correction windows and forcing rush remediation.

Key Findings

  • Financial Impact: LOGIC estimate: Rework labor: 50–200 hours × AED 150–300/hour = AED 7,500–60,000 per project; Material change costs: AED 20,000–200,000 (depending on scope); Construction delay penalties: AED 5,000–50,000+ per week; Typical total cost overrun: 10–25% of design/construction budget (AED 100K–1M+ on mid-sized projects).
  • Frequency: Per project phase; typically 1–2 audit cycles post-design; recurrence if compliance not integrated early.
  • Root Cause: Late-stage accessibility audits; manual audit methodologies (time-intensive); lack of accessibility standards in initial design briefs; insufficient designer training on WCAG 2.1 AA requirements.

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Accessible Architecture and Design.

Affected Stakeholders

Architects, Designers, Project Managers, Construction Teams, Compliance Auditors

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

غرامات عدم الامتثال لسياسة الوصول الرقمي (Digital Accessibility Non-Compliance Penalties)

LOGIC estimate: Statutory fines (non-specified in regulation but typical in GCC): AED 10,000–100,000+ per violation; Contract loss: 5–15% of annual government revenue (avg. AED 500K–2M for mid-sized architecture firms); Remediation costs: AED 50,000–500,000 depending on project scope.

فقدان العقود الحكومية بسبب عدم الامتثال (Loss of Government Contracts Due to Non-Compliance)

LOGIC estimate: Average government contract value (architecture/design): AED 500K–5M; Lost revenue per disqualification: 1–3 contracts/year = AED 500K–15M annually; Typical impact for mid-sized firms: 5–15% annual revenue loss = AED 250K–2M+; Blacklisting duration: 1–3 years (recovery period).

عدم الامتثال لمعايير إمكانية الوصول الرقمية

LOGIC-based estimate: Minimum statutory penalty range AED 10,000–50,000 per non-compliance incident; typical rework costs AED 5,000–15,000 per rejected permit; estimated 15–30 manual audit hours/project @ AED 200–400/hour = AED 3,000–12,000 per project.

Verbal Change Orders and Undocumented Variations

AED 500,000–2,500,000 per project (estimated 2–8% revenue leakage on typical AED 10–50M construction projects); typical site loses AED 50,000–200,000 annually in unrecoverable change order costs

Manual Change Order Evaluation Delays and Scope Creep Acceleration

AED 150,000–600,000 per project (3–12% margin erosion); typical 20–40 hour manual evaluation cost × AED 250–500/hour = AED 5,000–20,000 per change order; rush procurement premiums AED 30,000–100,000 per incident

Dubai Law No. 7 of 2025 Non-Compliance and License Suspension Risk

License suspension: AED 500,000–3,000,000 revenue loss per incident; audit failure fines: AED 50,000–250,000; reclassification downgrade: 15–40% bid margin reduction on future projects; legal defense costs: AED 100,000–500,000

Request Deep Analysis

🇦🇪 Be first to access this market's intelligence