تأخير الدفعات النهائية بسبب فترة الضمان (Retainage Cash Flow Drag)
Definition
Retention monies (typically 10% during construction, 5% post-handover, 5% after defects liability) create prolonged cash flow gaps. Contractors finance projects upfront but receive final payments 6–12 months later. Defect liability periods (commonly 6–12 months per search result [1]) are manually verified, delaying releases beyond contractual dates. For a AED 10M project, 5% final retention = AED 500K held for 6–12 months.
Key Findings
- Financial Impact: AED 50,000–500,000 per project in working capital financing costs (12% annual cost of capital on retained 5% of contract value); typical contractor portfolio: 5–10 concurrent projects = AED 250K–5M annual cash flow drag.
- Frequency: Per project completion cycle (6–18 months typical); affects 100% of UAE construction contracts.
- Root Cause: Contractual withholding mandated by client; defects verification manual and paper-based; no automated reconciliation of rectification milestones.
Why This Matters
This pain point represents a significant opportunity for B2B solutions targeting Building Structure and Exterior Contractors.
Affected Stakeholders
CFO/Finance Controller, Project Manager, Accounts Receivable, Treasury
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
خطأ توقيت ضريبة القيمة المضافة على الاحتفاظ (VAT Timing Mismatch on Retention)
عدم تتبع الفواتير والدفعات الجزئية المفقودة (Unbilled/Untracked Retainage & Partial Payment Loss)
قرارات غير مستنيرة بسبب نقص البيانات الفورية (Lack of Real-Time Retention Visibility)
تأخر معالجة أوامر التغيير وتأثر التدفق النقدي
تجاوز التكاليف بسبب سوء إدارة أوامر التغيير والنطاق الزاحف
خسارة الإيرادات بسبب عدم تفويض التغييرات وعدم القدرة على الفواتير
Request Deep Analysis
🇦🇪 Be first to access this market's intelligence