Unbilled Work & Change Order Omissions in BOQ-Based Billing

3 verified sources

Definition

BOQ defines all billable work items and quantities[4]. However: (1) Site variations require formal change orders, which are often delayed in approval; (2) Work outside BOQ scope (mobilization, temporary facilities) may not be explicitly priced; (3) Contingency allowances in contracts may be overlooked; (4) Performance incentives or penalty deductions are manually tracked, prone to error; (5) Change orders issued verbally but not documented in time for certification.

Key Findings

  • Financial Impact: 2–5% of contract value unbilled: AED 200,000–500,000 per AED 10M contract; delayed change order recovery = 30–60 days of additional AR aging; estimated loss on a AED 100M turnover = AED 2,000,000–5,000,000 annually
  • Frequency: Per change order event; cumulative monthly/quarterly billing cycles
  • Root Cause: BOQ is static; site variations require dynamic tracking. Manual change order workflow (verbal instruction → documented request → engineer approval → cost agreement → invoice) is slow. No automated linkage between site work orders, BOQ updates, and billing system.

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Building Structure and Exterior Contractors.

Affected Stakeholders

Project Manager, Site Engineer, Quantity Surveyor, Finance/Billing

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

VAT Cash Flow Mismatch on Certified Progress Billings

AED 500,000–1,000,000 annually on a AED 10M–20M turnover contractor (assuming 5% VAT rate and 10% retention); borrowing costs at 4–6% = AED 20,000–60,000/year in interest expense

Certification Trigger Confusion & VAT Reporting Errors

FTA penalties for VAT underreporting: AED 10,000–50,000 per audit finding; repeat violations or fraud: AED 50,000–500,000+. On a AED 100M turnover contractor, typical VAT exposure over 3 years = AED 1.5M–2M; penalties for errors = 5–10% of underreported VAT

Manual Billing Verification Bottleneck & Project Team Time Waste

40–80 hours/month × AED 150–300/hour (project accountant cost) = AED 6,000–24,000/month per project; cumulative across portfolio: AED 72,000–288,000/year for a 10-project portfolio. Delay-induced cash flow drag: 10–20 days additional AR aging = AED 500,000–2,000,000 in working capital tied up.

Corporate Tax 9% & E-Invoicing Compliance Burden (Jan 2027 Mandate)

System upgrade/ASP implementation: AED 50,000–200,000 one-time; annual tax compliance: AED 20,000–100,000 (accounting + audit); penalty risk: AED 10,000–100,000 per violation; cumulative 3-year cost = AED 150,000–600,000+

Certificate Falsification & Overbilling Risk in Manual Approval Chains

Falsified certificates: AED 100,000–1,000,000+ in audit penalties + legal liability; civil suits for overbilling = contractor forced refund + damages; reputational harm = project cancellations/blacklisting

Delayed Certification & Extended Retention Impact on Project Financing

Delayed certification adds 30–60 days to cash receipt cycle; financing cost = AED 500,000 borrowed × 5% / 365 × 60 days = AED 41,000 per certification delay; 12 cycles/year = AED 492,000 annually; covenant breach waivers = AED 10,000–50,000 per incident