عدم الامتثال لقرار مجلس الوزراء 121/2023 - تقارير الاختبار الرقمية (Non-Compliance with Cabinet Decision 121/2023 – Digital Test Reports)
Definition
Cabinet Decision 121/2023 requires manufacturers to implement factory production control (FPC) systems, issue Digital Product Passports with static and dynamic QR codes, and submit declarations of performance. The Notified Body assessment includes verification of product performance documentation. Failure to comply by the 27 November 2024 deadline prevents manufacturers from placing steel products on the market. Manual or slow report generation creates bottlenecks in the certification approval workflow, risking missed deadlines and license revocation.
Key Findings
- Financial Impact: Estimated: AED 50,000–250,000 in potential fines and suspension penalties per non-compliance finding; Plus loss of market access (estimated 10–30% revenue impact during suspension); Manual report generation: 15–25 hours/month per facility at AED 200/hour = AED 3,000–5,000/month operational overhead
- Frequency: Continuous (annual renewal and surveillance required); Critical at initial compliance deadline (27 Nov 2024 – PASSED; ongoing for new products and batch releases)
- Root Cause: Manual mill test report generation and traceability; delays in Digital Product Passport issuance; lack of automated QR code management; insufficient integration with MoIAT eServices portal
Why This Matters
This pain point represents a significant opportunity for B2B solutions targeting Primary Metal Manufacturing.
Affected Stakeholders
Manufacturing Operations Manager, Quality Assurance Officer, Regulatory Compliance Manager, Product Certification Specialist
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
تكاليف الامتثال لأنظمة التحكم في الإنتاج والشهادات (ISO 9001 & Factory Production Control Compliance Costs)
فقدان المبيعات والأخطاء في الفواتير بسبب تأخر إنشاء التقارير (Sales Loss & Invoicing Errors from Report Generation Delays)
تأخر التحقق من المنتجات وتأخر الدفع (Product Verification Delays & Cash Collection Lag)
اختناقات الإنتاج وتأخر إصدار شهادات المطابقة (Production Bottlenecks & Certification Delays)
ثغرات التتبع والشهادات المزيفة (Traceability Gaps & Fraudulent Certificates)
عدم الامتثال لنظام جواز السفر الرقمي للمنتجات الفولاذية
Request Deep Analysis
🇦🇪 Be first to access this market's intelligence