Multas e Embargos por Não-Conformidade com NR-13
Definition
NR-13 enforcement by Ministério do Trabalho requires documented proof of qualified weld procedures for all pressure-containing equipment. Companies with incomplete, missing, or non-digitized WPS/PQR records face equipment embargoes, suspension of operations, and administrative fines. Search results confirm NBR 14842 (inspector qualification standard) and NR-13 are mandatory in Brasil for boiler/tank manufacturing. Non-compliance during routine inspections typically triggers 30-60 day production halts pending documentation remediation.
Key Findings
- Financial Impact: R$ 120,000–R$ 250,000 per enforcement action (equipment embargo, production suspension, remediation labor). Typical fines: R$ 15,000–R$ 50,000. Lost production revenue during embargo: R$ 100,000–R$ 200,000 per week for mid-sized manufacturer.
- Frequency: 2–4 inspection cycles annually; enforcement action risk increases 40% if WPS/PQR records are incomplete or undigitized
- Root Cause: Manual, paper-based weld procedure specification management; no centralized version control; delays in document retrieval during unannounced regulatory inspections; lack of traceability of soldador qualifications (RQS)
Why This Matters
The Pitch: Manufacturing companies in Brasil waste up to R$ 150,000+ annually on NR-13 compliance failures and production downtime. Automated weld procedure specification tracking and digital document verification eliminate inspection delays and fine risk.
Affected Stakeholders
Compliance/Quality Manager, Production Supervisor, Regulatory Affairs
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Retrabalhado por Especificações de Procedimento Incompletas ou Desatualizado
Atraso no Ciclo de Aprovação por Documentação Manual de Procedimento
Multas e Paralização por Não-Conformidade NR-13
Sobrecusto de Certificação por Engenheiro Registrado Brasileiro (BRE)
Rework e Rejeição por Falhas de Conformidade de Material e Procedimento
Atraso no Recebimento por Falta de Prova de Conformidade NR-13
Request Deep Analysis
🇧🇷 Be first to access this market's intelligence