Erros de Decisão em Seleção de Fornecedores Sem Visibilidade de Desempenho

3 verified sources

Definition

Search results emphasize systematic vendor evaluation including 'histórico de desempenho'[1] and 'monitorar o desempenho dos fornecedores'[1]. Manual contract management prevents aggregation of performance data (response times, quality metrics, cost trends). Renewal decisions lack quantitative justification, leading to continued engagement with underperformers or unnecessary switching costs.

Key Findings

  • Financial Impact: 10-20% overpayment to low-performing vendors; for R$500,000 annual maintenance spend = R$50,000-100,000 overpayment
  • Frequency: Annual contract renewal cycles; cumulative underperformance compounds over 2-3 year contracts
  • Root Cause: No centralized performance tracking; data stored in disparate spreadsheets or emails; no automated comparison of actual vs. SLA performance

Why This Matters

Pitch: Brazilian manufacturers waste R$50,000-500,000 annually by retaining low-performing maintenance vendors due to poor visibility into contract performance metrics. Centralized contract performance dashboards enable data-driven vendor decisions.

Affected Stakeholders

Procurement managers, Finance/Budget controllers, Operations directors, Maintenance managers

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Serviços Não Faturados e Erros de Precificação em Contratos de Manutenção

Estimated 2-5% of preventive maintenance contract value; for R$100,000 annual maintenance spend = R$2,000-5,000 annual leakage

Despesas Inesperadas e Perda de Prazos em Manutenção Preventiva

Emergency maintenance costs 30-50% higher than planned; estimated R$20,000-50,000 annually on typical 500-person manufacturing operation

Multas por Incumprimento Contratual e Falta de Conformidade com SLAs

Contractual penalties: 1-5% of monthly service fees (R$1,000-10,000 per month on typical contracts); NF-e rejection fines: R$100-500 per rejected invoice (state-dependent)

Perda de Capacidade Operacional por Atraso em Aprovação de Manutenção

1-3% production loss per equipment downtime incident; for R$1M daily output = R$10,000-30,000 daily loss; typical 2-3 incidents monthly = R$20,000-90,000 monthly

Multas por Incumprimento de Conformidade Fiscal (NF-e e SPED)

R$ 500–1,500/month per CNPJ entity (late/incorrect filing fines) + operational loss during CNPJ suspension (full invoicing halt)

Multas SEFAZ por Erro de Conformidade em NF-e e Operações de Comércio Exterior

Regular penalty: 75% of unpaid tax; Range: 1%–150% depending on violation type. VAT/ICMS arrears + interest. For import drawback violations: Full suspended tax amount + interest from customs clearance date + late payment penalty (from day 31 after deadline). Estimated monthly exposure: BRL 500–1,500+ per month per compliance violation per state (Receita Federal); cumulative exposure for multi-state vendors: BRL 5,000–50,000+ per quarter.

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence