All 5 Documented Cases
Multa por Emissão Excessiva de Particulados e Suspensão de Operações
Estimated R$ 50,000–150,000 per violation (fines) + operational suspension costs (R$ 20,000–80,000/day production loss). Conservative annual risk: R$ 100,000–300,000 for non-compliant facilities.Brazilian legislation explicitly authorizes suspension of industrial operations exceeding particulate emission limits, with associated administrative fines. Manufacturers without proper dust control documentation face IBAMA (environmental authority) inspection findings, SEFAZ compliance holds, and production halts during remediation periods.
Paralisação de Produção por Falha em Controle de Poeira
Estimated R$ 20,000–80,000 per shutdown day (lost production revenue + penalty costs). Annual capacity loss: R$ 300,000–2,400,000 for typical limestone facility (20–30 suspended days).When dust control failures are detected during inspections, IBAMA issues Termos de Embargo (production embargoes) lasting 15–30 days minimum. Manufacturers without automated monitoring systems face longer suspensions because manual verification of corrective actions delays compliance sign-off.
Sobrecusto em Retrabalho de Correção de Conformidade Ambiental
Estimated R$ 7,000–15,000 per audit cycle × 2–3 cycles/year = R$ 14,000–45,000 annual consultant costs. Additional equipment retrofit costs: R$ 30,000–100,000 per corrective action implementation.When IBAMA inspection findings occur, manufacturers must engage external environmental consultants (average cost R$ 3,500–5,000 per audit) and implement corrective action plans. Manual dust control documentation leads to incomplete remediation, triggering follow-up audits and additional consultant fees. Typical facility undergoes 2–3 remediation cycles annually.
Multas por Não-Conformidade com Segurança de Barragens de Rejeitos
R$ 1,000,000,000 (R$ 1 billion) for dam collapse disasters; legal dispute costs (litigation, expert review, operational delays) estimated at R$ 500,000–R$ 5,000,000 for contested compliance interpretations.Law 14.066/2020 prohibited upstream tailings dam models and mandated emergency action plans. Updated NR 22 (Dec 2024) imposed stricter restrictions on permissible downstream installations. Regulatory ambiguity persists: ANM's controversial decision on waste/tailings ownership (outside mining title boundaries) and MTE's conditional relaxation create legal dispute risk. Fines reach R$ 1 billion for dam collapse disasters.