Qualitätsmängel und Rework durch unzureichende Konfigurationsverwaltung
Definition
Defense manufacturers must maintain strict traceability of every component, assembly revision, and design change per DEMAR 21. Manual processes—spreadsheet-based BOMs, email-driven approvals, manual document updates—create a gap between 'actual configuration' and 'documented configuration.' This leads to: (1) undocumented component substitutions, (2) assemblies built against outdated BOMs, (3) missing engineering change notices (ECNs) in delivered documentation, (4) in-service failures due to obsolete parts or design deviations. Each failure triggers customer compensation, extended warranties, and reputational damage in a market where defense contracts are long-term relationships.
Key Findings
- Financial Impact: €200,000–€2,000,000+ per major in-service failure; €5,000–€50,000 per warranty claim; estimated 30–50 rework hours per quality event
- Frequency: 1–3 quality events per major program annually (industry-standard for manual configuration management)
- Root Cause: Outdated or conflicting BOMs; undocumented component substitutions; missing or delayed ECN distribution; lack of version control on technical documentation; manual data entry errors
Why This Matters
This pain point represents a significant opportunity for B2B solutions targeting Defense and Space Manufacturing.
Affected Stakeholders
Design Engineering, Quality Assurance, Manufacturing, Field Service
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Beschaffungsverzögerungen und Mehrkosten durch manuelle Change-Control-Prozesse
Produktionskapazitätsverluste durch ineffiziente Change-Control-Zyklen
Schlechte Beschaffungsentscheidungen durch fehlende Transparenz in der Konfigurationsverwaltung
Kosten durch Fälschungsprüfungen und Ausschuss
Überkosten durch Obsoleszenz-Management
Genehmigungsverzögerungen für Kriegswaffen
Request Deep Analysis
🇩🇪 Be first to access this market's intelligence