Ungeplante Ausfallzeiten – Generationsverluste durch Teileunverfügbarkeit

2 verified sources

Definition

Manual inventory tracking and decentralized stock create parts-availability delays. When a turbine component fails and spare stock is unavailable (or miscounted as phantom stock), the unit must be powered down, awaiting external procurement (3–14 day lead times). At 2–4 MW capacity and €50–100/MWh wholesale prices, each day of outage is €2,400–€9,600 lost revenue.

Key Findings

  • Financial Impact: €2,400–€9,600 per 24-hour outage (2–4 MW × 24h × €50–100/MWh). For a 50-unit portfolio: 1–2 parts-driven outages/quarter = €10K–€40K lost revenue per quarter = €40K–€160K annually (conservative; high-risk portfolios: €200K–€500K).
  • Frequency: Quarterly (1–2 parts-availability driven incidents per 50-unit portfolio)
  • Root Cause: Phantom stock (inaccuracy); long procurement lead times from centralized OEM warehouses; lack of predictive parts forecasting (proportional hazards modeling absent).

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Renewable Energy Equipment Manufacturing.

Affected Stakeholders

Asset Managers, Maintenance Planners, Field Technicians, Finance (revenue recognition)

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Dezentralisierte Lagerbestände – Redundante Kostenblutung

€2–5% of O&M budget annually. For a 500 MW portfolio at €50/kW/year O&M = €25M budget → €500K–€1.25M annual loss.

Bestandsungenauigkeit – Unerkannte Fehlbestände und Schwund

€3,000–€15,000 per unplanned turbine shutdown (lost generation + emergency logistics). At 70–90% inaccuracy, expect 10–20 incidents/year per large facility = €30K–€300K annual loss per site. Across a 50-site portfolio: €1.5M–€15M.

Manuelle Lagerverwaltung – Zeitverschwendung und Effizienzlecks

€12K–€14.4K per site annually (40 hours/month × €30/hour blended cost × 12 months). Across 100-site DACH portfolio: €1.2M–€1.44M. Secondary loss: €50K–€100K per site from delayed repairs → extended downtime.

Betriebsprüfung – Bestandsdokumentation und Abschreibungsrisiken

€5,000–€50,000 per audit (typical 5–10 year audits cover multiple cycles). Estimated probability: 10–30% of large German operators (100+ MW portfolio) face audit challenges. Average loss: €10K–€30K. Across DACH region (est. 200+ large operators): €2M–€6M annual aggregate penalty exposure.

LkSG-Konformität – Lieferkettenrisiken und Dokumentationspflichten

€5,000–€800,000 depending on violation severity (§ 38 LkSG). Compliance workload: 20–40 hours/year per supplier × 10–20 active suppliers = €12K–€24K annual cost. Across DACH region, estimated 200+ large renewable operators at risk: €2.4M–€4.8M aggregate annual compliance cost.

Bußgelder und Verkaufsverbote bei VerpackG/ElektroG/BattG Nicht-Konformität

€200,000 per violation; immediate sales ban in Germany; marketplace delisting (100% revenue loss for affected product lines)

Request Deep Analysis

🇩🇪 Be first to access this market's intelligence