Netzüberlastung und Einspeiseverzicht durch Überkapazität
Definition
Installed capacity is 40-60% oversized relative to peak demand. N-ERGIE reports solar output 2x peak demand in service territory. Southern Germany at heightened risk of forced shutdowns and grid instability. Curtailment losses are not yet quantified in hard numbers, but grid operators signal growing concern.
Key Findings
- Financial Impact: Estimated €500M-1.5bn annual output loss from curtailment (5-15% of marginal solar production during peak season); no direct revenue during forced shutdown periods; grid connection fees remain payable.
- Frequency: Daily during May-September peak solar season; peak risk 11am-3pm on clear days.
- Root Cause: Grid expansion has not kept pace with solar capacity growth; no real-time incentive structure to reduce simultaneous injection; legacy grid design assumes centralized generation.
Why This Matters
This pain point represents a significant opportunity for B2B solutions targeting Solar Electric Power Generation.
Affected Stakeholders
Solar operators, Bundesnetzagentur (grid regulator), TSOs/DSOs (transmission/distribution operators), End consumers (via grid fees)
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Preiskanibalisierung und negative Strompreise im Solarmarkt
EEG-Kontenausfall und Bundessubventionsdrain
Historischer Tarifschock und Industrievernichtung (2012-2014)
Verzögerter Schadensfall-Auszahlungsprozess durch manuelle Dokumentation
Bußgelder und Versicherungslücken durch fehlende Nachweise bei Schadensfall
Manuelle Schadensfall-Dokumentation als Kapazitätsengpass
Request Deep Analysis
🇩🇪 Be first to access this market's intelligence