Die और Tooling Inventory में Manual Tracking से Production Bottleneck
Definition
Packaging manufacturing में die और tooling के लिए जब correct tool तुरंत available नहीं होता तो production line रुक जाती है। Manual tracking से shortage का पता देर से चलता है। Datum Tools का 1 million+ pieces का ready stock होने के बाद भी अगर inventory management manual है तो अलग-अलग warehouses में stock खो जाता है।
Key Findings
- Financial Impact: ₹15-40 लाख annually (estimated): (i) Lost production capacity: 50,000 units/month × 10-15% downtime × ₹100-200/unit contribution = ₹50-150 लाख; (ii) Emergency rush orders @ 20-30% premium; (iii) Overtime costs for catch-up production = ₹5-10 लाख/year
- Frequency: Continuous (daily production cycle impact)
- Root Cause: Disconnected ERP systems, manual die/tooling location tracking, lack of real-time stock visibility across multiple machines/stations
Why This Matters
The Pitch: भारतीय Packaging & Die Manufacturing companies manual inventory tracking से ₹15-40 लाख annually waste करते हैं (production delays, lost orders, overtime costs से)। Automated die/tooling inventory system से 24-hour ready stock visibility eliminate हो जाती है।
Affected Stakeholders
Production Scheduler, Inventory Manager, Die/Tool Operator, Quality Control
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
GST ITC Mismatch और Tool/Equipment Asset Tracking में Audit Failure Risk
Tooling Inventory Deterioration और Rework Cost (कमज़ोर Storage से)
Die और Tool Procurement Errors (Visibility की कमी से Over-Buying/Under-Buying)
Tool/Die Rental/Job Work Invoice Leakage (Manual Billing से Unbilled Tools)
क्रेडिट प्रोसेसिंग में देरी से कैश फ्लो हानि
शिकायत देरी से ग्राहक चर्न
Request Deep Analysis
🇮🇳 Be first to access this market's intelligence