Cost Overruns from Inaccurate As-Built Drawings

1 verified sources

Definition

Inaccurate or outdated as-built documentation in highway and bridge construction projects leads to unexpected rework and delays during subsequent improvements or adjacent projects. Engineers rely on flawed drawings, causing improper design basis and blown budgets. This is a systemic issue due to historical reductions in record-keeping staff and failure to update records during construction changes.

Key Findings

  • Financial Impact: $20 million per major project
  • Frequency: Recurring across multiple U.S. projects
  • Root Cause: Outdated or incomplete as-built drawings from inadequate documentation of changes and industry-wide staff reductions in record-keeping

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Highway, Street, and Bridge Construction.

Affected Stakeholders

Project Engineers, Designers, Contractors, Owners

Deep Analysis (Premium)

Financial Impact

$20 million per major project in cost overruns β€’ $20 million per major project in cost overruns from delays and rework β€’ $20 million per major project in overruns from rework and delays

Unlock to reveal

Current Workarounds

Digital PDF annotations and Excel for tracking deviations. β€’ Emailing scanned drawings with manual annotations and Excel summaries for change tracking. β€’ Excel spreadsheets for change logs combined with paper markups.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Request Deep Analysis

πŸ‡ΊπŸ‡Έ Be first to access this market's intelligence