🇺🇸United States

Engineering and operations capacity drained by manual EAS testing, configuration, and troubleshooting

2 verified sources

Definition

EAS compliance requires continuous equipment monitoring, routine tests, detailed logging, and configuration updates that consume limited engineering and operations bandwidth. FCC reports after nationwide tests have identified improperly configured equipment and shortcomings in state EAS plans, implying repeated test failures, retesting, and field visits that tie up staff and delay other revenue‑generating technical work.

Key Findings

  • Financial Impact: $3,000–$10,000 per station per year in engineering labor and overtime for ongoing EAS checks, retests, and on‑site interventions; multi‑station groups can lose $50,000+ in productive engineering capacity annually
  • Frequency: Weekly (required weekly tests and log checks), monthly (required monthly tests), and after each national test or rule change
  • Root Cause: Part 11 requires EAS participants to install, maintain, and monitor certified equipment, conduct regular weekly and monthly tests, and participate in national tests, all of which are still heavily manual in many stations. Outdated hardware, poor documentation, and inconsistent state plans increase the time needed for troubleshooting and coordination, diverting engineers from projects such as infrastructure modernization, studio consolidation, or new service launches.

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Radio and Television Broadcasting.

Affected Stakeholders

Chief Engineer / Station Engineer, Assistant Engineer / Contract Engineer, Operations Manager, Master Control Operator, IT/Network Administrator

Deep Analysis (Premium)

Financial Impact

$10,000–$25,000 per major political cycle in labor plus opportunity cost and conservative over-delivery to avoid disputes. • $10,000–$30,000 per major election cycle in staff time and outside counsel review, plus monetary concessions to avoid drawn-out disputes. • $10,000–$30,000 per year in lost engineering productivity and overtime in clusters with several retransmission feeds and complex headend architectures.

Unlock to reveal

Current Workarounds

Business Affairs Manager coordinates via email with engineering and programming to get EAS logs and playout data, manually matches them in spreadsheets, and drafts explanations and revised schedules or credits. • Business Affairs Manager manually compiles documentation by requesting EAS logs from engineering, as-run logs from traffic, and stitching them together in spreadsheets and PDFs to produce affidavits and settlement proposals. • Chief Engineer manually compiles logs and configs from disparate tools

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Request Deep Analysis

🇺🇸 Be first to access this market's intelligence