🇺🇸United States

Excess overtime and waste from poor loom order sequencing and manual data collection

4 verified sources

Definition

When loom and knitting machine schedules are not optimized with real‑time data, changeovers, style swaps, and rush orders cause overtime, excess labor, and material waste. Case studies show that digitizing loom planning and tracking significantly cuts standstills, reduces waste, and improves adherence to standard times, meaning those costs were recurring before MES/OEE deployment.

Key Findings

  • Financial Impact: $50,000–$300,000 per year in avoidable overtime and waste for a typical plant depending on size and product mix
  • Frequency: Weekly
  • Root Cause: Planners sequence orders manually without visibility into actual loom status, upcoming changeovers, or material availability, leading to last‑minute resequencing, partial runs, and repeated setups; paper‑based recording obscures true standard times and efficiency, so staffing and shift lengths are routinely padded with overtime to meet delivery dates.

Why This Matters

This pain point represents a significant opportunity for B2B solutions targeting Textile Manufacturing.

Affected Stakeholders

Production planner, Shift supervisor, Weaving/knitting manager, Industrial engineer/time‑study analyst, HR/payroll (overtime cost tracking), CFO/Controller

Deep Analysis (Premium)

Financial Impact

Data available with full access.

Unlock to reveal

Current Workarounds

Data available with full access.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Request Deep Analysis

🇺🇸 Be first to access this market's intelligence