🇧🇷Brazil

Perda de Capacidade por Paradas Não Planejadas

3 verified sources

Definition

Manual scheduling in technician dispatch causes unplanned stops, reducing equipment availability and increasing production losses.

Key Findings

  • Financial Impact: R$20,000 - R$100,000 per unplanned stop (industry avg. downtime cost); 10-20% capacity loss[1][2][3]
  • Frequency: Weekly/monthly in manual processes
  • Root Cause: Lack of digital planning tools for dispatch, leading to reactive maintenance

Why This Matters

The Pitch: Commercial and Industrial Machinery Maintenance players in Brasil 🇧🇷 waste R$50,000+ annually per plant on unplanned stops. Automation of dispatch scheduling eliminates this risk.

Affected Stakeholders

Gerente de Manutenção, Técnico de Campo, Planejador de Produção

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence