Excesso de Horas Extras e Suprimentos Desnecessários
Definition
Manual processes in time and materials tracking cause waste through unmonitored overtime, rush orders, and excess supplies, amplified by Custo Brasil.
Key Findings
- Financial Impact: R$20.000-100.000/ano em overtime excessivo e suprimentos; 20-40 horas/mês em rastreamento manual[1][2][3]
- Frequency: Mensal em operações sem automação
- Root Cause: Falta de rastreamento em tempo real leva a erros operacionais e estoques inflados
Why This Matters
The Pitch: Commercial and Industrial Machinery Maintenance players in Brasil 🇧🇷 waste R$50.000+ annually on manual tracking overruns. Automation of real-time logging eliminates this risk.
Affected Stakeholders
Gerente de Manutenção, Supervisor de Produção
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Multas por Erros em NF-e de Serviços T&M
Perda de Capacidade por Equipamentos Ociosos
Serviços Não Faturados em Tempo e Materiais
Custo de Retrabalho por Erros de Rastreamento
Multas por Não Conformidade com Documentação NR-12
Overhead de Gestão Manual de Documentação de Inspeção NR-12
Request Deep Analysis
🇧🇷 Be first to access this market's intelligence