🇧🇷Brazil

Multas por Non-Conformidade com Portaria INMETRO 459 - Rotulagem de Calçados

1 verified sources

Definition

INMETRO Portaria No. 459 mandates that all footwear manufactured, imported, distributed, or sold in Brazil carry labels compliant with ABNT NBR 16679 standard. Labels must include material composition, country of origin, size, and unique international identifier (GTIN). Failure to comply may trigger fines up to R$ 1.5 million, product seizure, and establishment closure.

Key Findings

  • Financial Impact: Up to R$ 1,500,000 per violation (fine); plus product seizure and operational closure costs. Additional indirect losses from missed compliance deadlines (July 31, 2026 for manufacturers/importers).
  • Frequency: One-time implementation risk with ongoing compliance verification required annually or per enforcement action.
  • Root Cause: Regulatory mandate without adequate pre-compliance warning period (approximately 12 months from August 2025 to July 2026 deadline); lack of integrated GTIN/labeling automation in existing production systems.

Why This Matters

The Pitch: Brazilian footwear manufacturers face statutory fines up to R$ 1.5 million per violation for failing to implement INMETRO-compliant labeling by July 31, 2026. Additionally, product seizure and facility closure are enforcement tools. Early implementation and automated compliance verification eliminate regulatory exposure and market disruption.

Affected Stakeholders

Production Managers, Supply Chain Directors, Compliance Officers, Import/Export Managers, E-commerce Operations

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Custos de Implementação de Conformidade com ABNT NBR 16679 e Sistemas de Rastreabilidade GTIN

Estimated R$ 50,000–500,000 one-time implementation per manufacturing facility (system integration, label design, testing). Ongoing R$ 5,000–15,000/month for GTIN management, compliance audits, and e-commerce metadata updates. Typical small-to-mid footwear manufacturer: R$ 100,000–300,000 first-year cost.

Multa por Não Conformidade de Etiquetagem Obrigatória de Calçados

R$ 1.5 million per administrative violation (fine), plus product seizure and business closure risk; typical compliance remediation: 200-400 hours of manual label audit work at R$ 150-250/hour = R$ 30,000-100,000 per remediation cycle

Risco de Apreensão de Produtos e Fechamento de Estabelecimento por Não Conformidade de Rastreabilidade

Product seizure loss: 20-100% of warehouse inventory value at time of inspection (typical range: R$ 500,000-5,000,000 per seizure event); operational closure: R$ 50,000-200,000/day in lost fulfillment revenue during reopening process

Multa por Não Conformidade com Portaria INMETRO 459 – Rotulagem Obrigatória de Calçados

Fines up to R$ 1.5 million per infraction; product seizure; store closure. Additional costs: system implementation, relabeling inventory, supply chain audit (estimated 10–20% of annual COGS for non-compliant stock).

Custo Brasil – Implementação de Sistema de Rotulagem ABNT NBR 16679 e Rastreabilidade GTIN

Estimated implementation cost: R$ 200k–R$ 1.2M per manufacturer site (system integration, label design, supplier coordination, staff training, quality audit). Rework/scrap during transition: 2–5% of production run (R$ 50k–R$ 300k per month during Q1–Q2 2026). Logistics delays: 5–10 working days per shipment due to label verification; impact on time-to-market (2–4 week delays = lost sales of R$ 100k–R$ 500k per delayed batch).

Perda de Capacidade de Produção – Validação Manual de Rótulos e Verificação de Conformidade GTIN

Production throughput loss: 2–5% of daily output (R$ 50k–R$ 200k/month). Idle equipment time: 5–15 hours/week × equipment cost (R$ 5k–R$ 15k/hour) = R$ 25k–R$ 225k/month. Logistics queue delay: 2–3 working days per shipment; impact on time-to-cash (DSO increase of 3–5 days, working capital drag of R$ 100k–R$ 500k per month for mid-sized firm).

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence