Orçamentos Descontrolados e Superação de Custos

2 verified sources

Definition

In interior design, projects charge R$100-150/m² for design plus 10-15% of total obra for execution management, but manual tracking leads to variances from supplier cotations, material choices, and unmonitored adjustments[1][2].

Key Findings

  • Financial Impact: R$10,000+ overrun per mid-size project (10-15% of obra custo total, e.g., R$100k obra = R$10-15k loss); 20-40 hours/month manual reconciliation
  • Frequency: Per project execution phase
  • Root Cause: Lack of real-time cost variance reporting and centralized expense control in multi-supplier projects

Why This Matters

The Pitch: Interior Design firms in Brasil 🇧🇷 waste 10-15% of total obra costs on poor variance reporting. Automation of budget tracking eliminates overruns and ensures compliance with eSocial reporting.

Affected Stakeholders

Gerente de Projetos, Designer de Interiores, Proprietário de Estúdio

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Erros de Decisão por Falta de Visibilidade em Orçamentos

R$5,000-15,000 per project in rework and compras equivocadas (2-5% of R$100-300k typical project); 10-20 hours per phase wasted

Multas por Falhas em NF-e no Rastreamento de Custos de Obra

R$1,000-R$5,000 multa per rejected NF-e (statutory SEFAZ minimum); 5-10% admin custo extra from manual validation

Multas por Programa de Compliance Deficiente em Contratos Públicos

R$ 0.02% per day on contract value (capped at 10% total). Example: R$ 1M contract = R$ 200/day = R$ 73,000/year at 10% max fine. For R$ 5M contract: R$ 365,000 maximum penalty.

Multas de Transfer Pricing em Coordenação de Documentos Entre Entidades

0.2% per month penalty on gross revenue (late submission); 3% penalty on gross revenue (incomplete/inaccurate info); 5% penalty on intercompany transaction value (RFB inspection with untimely response). Example: R$ 2M design revenue = R$ 4,000/month (late) or R$ 60,000 (incomplete) or R$ 50,000+ (inspection non-compliance).

Sanções Ambientais em Projetos de Design e Coordenação de Construção

Environmental fines: 'heavy fines to temporary or permanent suspension of activities' per Law 9,605/98. Typical administrative fines: R$ 50,000–500,000+; criminal fines R$ 100,000–5,000,000 for serious violations (hazardous waste mishandling, pollution). Project suspension = lost design fees and reputational damage.

Desperdício de Tempo em Coordenação Manual de Documentos com Arquitetos

40–80 hours/month of project manager/coordinator time (R$ 80–150/hour burdened = R$ 3,200–12,000/month or R$ 38,400–144,000/year per project). For design firm with 3–5 concurrent projects: R$ 115,200–720,000 annual waste on manual coordination.

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence