Desperdício e Obsolescência de Estoque
2 verified sources
Definition
Accumulation of unused or outdated spare parts leads to total loss through disposal without recovery.
Key Findings
- Financial Impact: 20-40% of inventory value annually (R$200k-R$2M for typical plants)
- Frequency: Detected during annual inventories
- Root Cause: No periodic audits or ABC classification in manual systems
Why This Matters
The Pitch: Brasil 🇧🇷 manufacturers discard R$300k+ yearly in obsolete renewable parts. Automated inventory tracking purges waste instantly.
Affected Stakeholders
Estoquista, Auditor Interno, Fiscal Contábil
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Unlock to reveal
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Unlock to reveal
Get Solutions for This Problem
Full report with actionable solutions
$99$39
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Excesso de Estoque e Custos de Armazenagem
R$100k-R$1M+ annually in storage and obsolescence costs for mid-sized manufacturers
Paradas por Falta de Peças Sobressalentes
R$50k-R$500k per downtime event (1-3 days production loss)
Falta de Fiscalização em Logística Reversa de Painéis Solares
Estimated: R$50,000-R$200,000 annually per manufacturer (avoided reverse logistics infrastructure costs); Indirect: Environmental liability exposure under potential IBAMA classification of photovoltaic waste as 'special materials'
Custo Brasil em Reciclagem: Falta de Infraestrutura Regulada
Estimated: R$40,000-R$120,000 annually per manufacturer (external recycling contracts + administrative handling); Industry-wide: R$2-5 million annually (estimated 40-50 major manufacturers)
Sobrecustos de Conformidade Fiscal (NF-e/SPED) em Serviços de Instalação
20-40 hours/month of manual tax coordination per 10 technicians = 240-480 hours/year per crew; at R$150/hour blended contractor cost = R$36,000-72,000/year per 10-person crew; multiplied by 5-10 installation crews per manufacturer = R$180,000-720,000 annual compliance overhead
Multas Ambientais por Atrasos na Licença de Instalação (LI)
IBAMA penalties: R$500-5,000/day for unlicensed operation; typical LI delays = 30-60 days = R$15,000-300,000; project finance penalties for covenant breach = R$100,000-500,000 per month depending on debt structure; for 5-10 concurrent projects, annual exposure = R$500,000-2,000,000