🇧🇷Brazil

Alterações de Escopo Descontroladas em Obras

2 verified sources

Definition

Residential construction projects in Brasil face uncontrolled scope alterations due to informal change management. Source [1] documents that 'many projects fail due to excess or uncontrolled alterations.' Without integrated change control systems, cost overruns accumulate as materials are ordered redundantly, labor is reassigned, and rework becomes necessary.

Key Findings

  • Financial Impact: 5-15% of project budget (typical range: R$ 50,000-500,000 per project depending on size)
  • Frequency: Occurs on 60-80% of projects with inadequate change control
  • Root Cause: Lack of formalized, documented change order approval workflows; absence of baseline scope freezing; manual tracking of modifications

Why This Matters

The Pitch: Brazilian construction firms waste 5-15% of project budgets annually on uncontrolled scope alterations and rework. Digitizing change order workflows with mandatory cost/schedule validation eliminates unauthorized modifications.

Affected Stakeholders

Project Manager, Site Supervisor, Budget Controller, Contractor

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence