Alterações de Escopo Descontroladas em Obras
Definition
Residential construction projects in Brasil face uncontrolled scope alterations due to informal change management. Source [1] documents that 'many projects fail due to excess or uncontrolled alterations.' Without integrated change control systems, cost overruns accumulate as materials are ordered redundantly, labor is reassigned, and rework becomes necessary.
Key Findings
- Financial Impact: 5-15% of project budget (typical range: R$ 50,000-500,000 per project depending on size)
- Frequency: Occurs on 60-80% of projects with inadequate change control
- Root Cause: Lack of formalized, documented change order approval workflows; absence of baseline scope freezing; manual tracking of modifications
Why This Matters
The Pitch: Brazilian construction firms waste 5-15% of project budgets annually on uncontrolled scope alterations and rework. Digitizing change order workflows with mandatory cost/schedule validation eliminates unauthorized modifications.
Affected Stakeholders
Project Manager, Site Supervisor, Budget Controller, Contractor
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Risco de Multa por Não-Conformidade em Registro de Alterações de Obra
Gargalo Operacional em Aprovação de Alterações de Obra
Decisões de Compra sem Visibilidade de Mudanças Aprovadas
Multas por Não Conformidade com NR 18 - Segurança do Trabalho
Multas por NF-e Não-Conforme em Faturas de Fechamento de Obra
Atraso em Recebimento por Rejeição de NF-e no Fechamento de Obra
Request Deep Analysis
🇧🇷 Be first to access this market's intelligence