Excesso de Estoque de Peças de Reposição

1 verified sources

Definition

In Brazilian petrochemicals, DigiPart analysis of 15,000 spare parts revealed 47% as surplus, highlighting inventory bloat common in robot manufacturing due to import delays and production halts.

Key Findings

  • Financial Impact: R$ millions in tied-up capital (47% surplus on typical R$ 10M+ inventories); production halts up to 180 days
  • Frequency: Ongoing due to import delays
  • Root Cause: Manual inventory reviews fail to identify surplus amid long replacement times

Why This Matters

The Pitch: Robot manufacturing players in Brasil 🇧🇷 waste capital on excess spare parts inventory. Automation of inventory analysis eliminates 47% surplus stock.

Affected Stakeholders

Gerente de Estoque, Coordenador de Manutenção

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Custos de Estoque Obsoleto em MRO

20-40% aumento em custos de carrying por estoque excessivo; horas manuais de contagem (10-20h/semana)

Paradas de Produção por Falta de Peças

180 dias de downtime por incidente; milhões em receita perdida por equipamento ocioso

Risco de Penalidades por IA em Despacho de Campo (Lei nº 2.338/2023 - Regulação de IA)

Quantified: R$50,000,000 (statutory maximum per infraction); Operational ban on AI system (100% revenue loss if dispatch is AI-dependent); Estimated compliance cost to remediate: R$200,000–R$1,000,000 (algorithmic audit, impact assessment, governance redesign)

Multa por Não Conformidade com NR 12 - Validação Obrigatória e A.R.T.

Direct penalty: Machine sales prohibition and operational shutdown. Indirect: 15-30 business days delay per machine for CREA engineer assessment and A.R.T. issuance; typical CREA assessment cost R$ 2,000-8,000 per machine. Estimated capacity loss: 5-15 units/month × 3-6 month delays in product launches.

Atraso no Lançamento de Produto - Falta de Sincronização entre NR 12 e Certificação ISO/CE

Indirect: 60-120 calendar days product launch delay × 2-4 lost sales units/month = 10-40 units lost per quarter. Estimated value loss R$ 300,000-2,000,000 per delayed product line (assuming R$ 30,000-100,000 per collaborative robot unit). Manual compliance coordination overhead: 40-60 hours/month of engineering time (R$ 8,000-15,000/month).

Custo Brasileiro Ampliado - Documentação em Português + Validação CREA Duplicativa

Per-unit cost: R$ 15,000-43,000 in compliance overhead per machine (documentation + CREA assessment). For a 50-unit annual product line: R$ 750,000-2,150,000 incremental cost. Recurring cost from regulation changes: NR 12 updated 2-3 times annually, requiring documentation revisions (estimated R$ 20,000-50,000 per regulatory change).

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence