Dilatação de Prazos em Projetos de Construção Naval (Project Timeline Bleed)

2 verified sources

Definition

The corvette Barroso at Rio de Janeiro Navy Arsenal (AMRJ) began construction in 1994 with a planned 5-year duration but took 14 years to complete. This 180% timeline overrun is directly attributed to absence of continuous budget flow and milestone payment cycles. PROSUB submarine program similarly faces systematic delays due to remains payable (RP) deferral mechanisms.

Key Findings

  • Financial Impact: Corvette Barroso: 9-year delay = estimated R$ 80-200 million in indirect costs (labor inflation, materials escalation, equipment rental); PROSUB ongoing delays = indefinite R$ cost accumulation
  • Frequency: Chronic: 2014-2025; Affects all major naval construction projects in Brasil
  • Root Cause: Annual budget cycles create payment discontinuity; Remains Payable (RP) mechanism defers expenses across fiscal years; Political budget cuts reduce milestone funding allocation; Absence of multi-year appropriations

Why This Matters

The Pitch: Brazilian shipyards lose R$ 50-150 million per major project due to timeline bleed caused by irregular milestone payments. Real-time progress tracking and automated payment validation reduce delays and compress construction schedules.

Affected Stakeholders

Project Managers, Construction Supervisors, Budget Controllers, Supply Chain

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Atraso em Pagamentos de Marcos Contratuais (Milestone Billing Delays)

BRL 2.5 billion+ in decommissioning plans alone (2025-2029); Immediate: Multiple shipyard payment suspensions; Historical: Enseada shipyard payments halted post-Lava Jato investigations

Multas e Embargo por Falha em Conformidade Fiscal em Pagamentos de Marcos (NF-e/SPED Rejection Cascade)

SEFAZ penalties: R$ 5,000-20,000 per rejected NF-e batch (27 states × varying severity); SPED audit costs: R$ 50,000-200,000 per investigation; Manual correction labor: R$ 2,000-5,000 per invoice × 100-500 invoices/year = R$ 200k-2.5M annually

Churn e Perda de Clientes por Falta de Previsibilidade de Pagamento (Customer Loss Due to Payment Unreliability)

Lost export contracts: 10-15% of potential order flow × R$ 50-200M per contract = R$ 500M-3B annually; Higher financing costs: 2-5% risk premium on supply chain financing = R$ 100-300M annually

Falta de Controle em Pedidos de Mudança (Change Orders) em Contratos de Preço Fixo

Estimated R$ 800M–R$ 1.6B annually across Brazilian naval industry (based on ~10–20% cost bleed on active shipbuilding contracts valued at ~R$ 8B–R$ 16B; typical shipbuilding change order overruns: 10–20% per industry benchmarks). FMM budget rejection delays = 30–90 days of financing hold per contract = R$ 5M–R$ 50M in interest costs per major contract.

Risco de Multa Fiscal por Inconsistência NF-e em Alterações de Pedidos

SEFAZ penalties: R$ 50K–R$ 500K per compliance violation (typical fine range for NF-e errors in manufacturing). Audit remediation: 40–80 hours at R$ 300–500/hour = R$ 12K–R$ 40K per incident. Estimated 2–5 compliance incidents/year per major shipyard = R$ 124K–R$ 2.7M annual exposure.

Atrasos em Negociação de Mudanças de Pedidos Causam Perda de Capacidade Produtiva

Idle dry-dock capacity: Major shipyards have 1–2 operational dry docks per facility. A dry dock idle for 20 days/year (conservative, assuming 5–10 change order cycles at 2–3 days each, understating actual delays) at R$ 50K–R$ 100K/day = R$ 1M–R$ 2M capacity loss per dry dock. Across 27 operational Brazilian shipyards[1], estimated capacity loss: R$ 27M–R$ 54M annually. Labor inefficiency (redirection to rework during negotiation waits): 10–20% of shipyard workforce (assume 5,000–10,000 workers across industry) × 20–40 days/year = 100K–400K labor hours diverted, valued at R$ 3M–R$ 20M annually.

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence