🇧🇷Brazil

Vazamento de Receita por Energia Curtailada

2 verified sources

Definition

High curtailment rates squeeze margins in solar projects, especially in Northeast-Southeast corridor, where excess solar generation cannot be injected due to grid limits, resulting in unbilled energy sales.

Key Findings

  • Financial Impact: 11% curtailment = R$ 1.5-3 billion lost revenue/year (on 2025 67 GW base at R$ 350-450/MWh).
  • Frequency: Quase diário em clusters solares saturados.
  • Root Cause: Falta de visibilidade em forecasting e delays manuais em gerenciamento de curtailment.

Why This Matters

The Pitch: Usinas solares no Brasil perdem 8-11% de faturamento anual por curtailment não gerenciado. Automação de forecasting previne perda de faturamento em PPAs e spot market.

Affected Stakeholders

Analista de Receita, Equipe Comercial, Gestor de PPAs

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Perda de Capacidade por Curtailment

R$ 2-5 billion annually in lost revenue (8-11% national curtailment on 67 GW solar capacity at avg R$ 400/MWh).

Atraso na Cobrança e Recebimento de Créditos de Energia

Estimated 30-60 days delayed cash collection per billing cycle; typical impact of 2-4% annual financial loss for operators managing 50+ beneficiary contracts (estimated R$50,000–R$200,000 annual opportunity cost for mid-size solar lease portfolios).

Divergências no Rateio de Créditos de Energia e Perda de Receita

Estimated 1-5% annual revenue loss from energy credit divergences; for a mid-size solar lease portfolio generating R$500,000–R$1,000,000 annually, this represents R$5,000–R$50,000 in unrecovered credits.

Gargalos Operacionais no Cadastro e Gestão de Contratos de Aluguel

Estimated 20-40 hours per month of administrative staff time for managing 50–100 contracts (typical portfolio); at Brazilian average labor cost of R$50–R$80/hour, represents R$40,000–R$128,000 annual opportunity cost; also estimated 2-3% deal slippage (missed renewals, lapsed contracts) annually.

Riscos de Conformidade Fiscal e Não-Conformidade com Regulação ANEEL

Estimated statutory penalties: (a) NF-e rejection/non-issuance: R$2,000–R$10,000 per occurrence; (b) SPED omission: R$500–R$5,000 per month; (c) Income tax underreporting: 75% of undeclared amount + interest; (d) ANEEL non-transparency audit: project disqualification or R$10,000–R$100,000 administrative fine. Typical cumulative annual risk for non-automated operators: R$15,000–R$75,000.

Compra desnecessária de Certificados de Energia Renovável (I-REC) no Brasil

R$ 380M+ em despesa desnecessária estimada (diferença de 5,5M certificados × ~R$ 70/certificado, baseado em declínio de preço global de créditos renovável de US$ 4/tCO2 para US$ 2/tCO2)[2][4]

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence