ट्रांसमिशन बॉटलनेक के कारण अवरुद्ध क्षमता हानि

1 verified sources

Definition

As of July 2025, ~8 GW of Rajasthan's 22 GW ISTS-connected RE projects remain stranded due to transmission infrastructure delays, technical/ecological hurdles, and speculative grid access. Projects operational but unable to feed power incur carrying costs with zero revenue.

Key Findings

  • Financial Impact: ₹10,000-15,000 crores annually (50 GW × ₹2-3 crores/GW annual carrying cost); Rajasthan alone: ₹1,500-2,000 crores (8 GW stranded)
  • Frequency: Ongoing; expanding as RE additions outpace transmission build
  • Root Cause: Lack of state-wise transmission planning roadmaps. Connectivity granted without evacuation infrastructure confirmation. Absence of cluster-demand forecasting (data centers, EV hubs).

Why This Matters

The Pitch: Renewable energy operators in India lose ₹10,000-15,000 crores annually from 50 GW stranded capacity. Real-time transmission bottleneck tracking and connectivity validation prevents asset-stranding.

Affected Stakeholders

RE Project Developers, Asset Owners, Grid Connection Applicants, Financial Planners

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

CEA ग्रिड कम्प्लायंस स्टडीज़ का अनिवार्य खर्च

₹50-200 lakhs per project (redesign costs); 6-12 month approval delays translating to ₹2-5 crores financing cost per GW project

नवीकरणीय ऊर्जा विचलन दंड और राजस्व हानि

5-15% annual revenue loss per MW; 50 MW solar project: ₹5-15 lakhs annual penalty; Sector-wide: ₹5,000+ crores annually across 200+ GW operational capacity

ग्रिड संपर्क परिवर्तन समय सीमा की चूक दंड

₹50-200 crores per project (full project value lost); 100 MW project: ₹100-200 crores; Sector-wide: ₹10,000+ crores risk exposure across 200+ GW pipeline

CTU अनुमोदन में विलंब—प्रकल्प राजस्व विलंब

₹1-5 crores per month delay per 100 MW project; 12-month delay: ₹12-60 crores (financing interest + lost PPA revenue); Sector-wide: ₹50,000+ crores annual opportunity cost from approval delays

आपातकालीन मरम्मत समन्वय में अनावश्यक लॉजिस्टिक्स लागत

₹50-150 lakhs per incident; 2-5 incidents/year in cyclone-prone regions = ₹1-7.5 crore annual loss per utility

ग्रिड अधिसूचना अनुपालन विफलता और संविदात्मक दंड

₹10-50 lakhs per contractual breach; typical wind farm 100-150 MW loses ₹3-8 lakhs/day of non-compliance × 3-5 day manual notification delays = ₹10-40 lakhs per incident

Request Deep Analysis

🇮🇳 Be first to access this market's intelligence