Paralisação de Produção por Falha em Controle de Poeira
Definition
When dust control failures are detected during inspections, IBAMA issues Termos de Embargo (production embargoes) lasting 15–30 days minimum. Manufacturers without automated monitoring systems face longer suspensions because manual verification of corrective actions delays compliance sign-off.
Key Findings
- Financial Impact: Estimated R$ 20,000–80,000 per shutdown day (lost production revenue + penalty costs). Annual capacity loss: R$ 300,000–2,400,000 for typical limestone facility (20–30 suspended days).
- Frequency: 2–4 unplanned shutdowns per year in facilities with manual dust control systems.
- Root Cause: Inadequate real-time dust monitoring; delayed detection of system failures; manual compliance reporting to IBAMA increases verification time.
Why This Matters
The Pitch: Lime and gypsum producers in Brasil lose 10–40 production days annually due to regulatory-ordered shutdowns caused by inadequate dust documentation. Real-time automated monitoring systems prevent these capacity losses entirely.
Affected Stakeholders
Plant Manager, Production Scheduler, Environmental Manager, Sales/Revenue Planning
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Related Business Risks
Multa por Emissão Excessiva de Particulados e Suspensão de Operações
Sobrecusto em Retrabalho de Correção de Conformidade Ambiental
Multas por Não-Conformidade com Segurança de Barragens de Rejeitos
Custo de Remediation e Perda de Direitos Minerários por Atraso de Pagamento TAH
Request Deep Analysis
🇧🇷 Be first to access this market's intelligence