Definition

Brazilian law (Article 618, Civil Code) grants builders 5-year warranty responsibility, but the NBR 17170 norm (2022) made warranty conditional on proving regular maintenance. Property owners have only 180 days from defect discovery to file claims. Manual collection of maintenance receipts, service logs, and approvals creates gaps. Companies cannot substantiate warranty claims, lose legal standing, and cannot collect from builders or insurers. Disputes over 'whose fault is maintenance?' delay cash recovery 6–18 months.

Key Findings

  • Financial Impact: Estimated R$ 50,000–500,000 per project (typical medium-sized residential/commercial build). Assume 10–20% of warranty-eligible defects go unrecovered due to documentation loss. Annual time cost: 40–60 hours/project for manual maintenance record aggregation and legal proof assembly.
  • Frequency: Ongoing; triggered at handover and extends 5 years. Peak pain at years 2–4 when defects emerge.
  • Root Cause: Fragmented maintenance records (PDF invoices, WhatsApp photos, physical receipts). No unified proof-of-maintenance system. 180-day statute of limitations creates urgency. Manual processes miss deadlines.

Why This Matters

The Pitch: Brazilian construction companies waste significant capital on unrecovered warranty claims because maintenance documentation is scattered across emails, photos, and physical records. Automation of lien-equivalent receivables tracking (warranty claims) and maintenance proof collection eliminates disputes and preserves R$ 50,000–500,000+ in claims per medium-sized project.

Affected Stakeholders

Facility Managers, Condominium Administrators, Warranty Claims Processors, Construction Lawyers, Insurance Adjusters

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Atraso na Resolução de Reclamações de Garantia e Litígios Resultantes

Estimated R$ 100,000–1,000,000 per year per large property management firm (5–50 properties). Time cost: 20–40 hours per claim × 10–50 claims/year = 200–2,000 hours/year of manual coordination. Average cost per lost claim (forfeiture): R$ 20,000–100,000 depending on defect severity.

Risco de Litígio e Perda de Indenização por Defesa Inadequada de Direitos de Garantia

Estimated R$ 30,000–200,000 loss per disputed claim (settlement haircut + litigation costs). Litigation time: 18–36 months delay in cash recovery. Legal + expert costs: R$ 15,000–50,000 per claim. Annual impact for large property manager: R$ 150,000–500,000 in settlements/haircuts + 500–1,000 hours of legal coordination.

Multas por Não Conformidade com Normas Regulamentadoras (NRs) de Segurança

R$ 50,000–250,000 per audit cycle (estimated); 20–40 hours/month manual compliance documentation

Desperdício de Horas de Trabalho em Inspeções Manuais e Documentação de Conformidade

20–40 hours/month per active site × R$ 60–100/hour (Safety Manager/Coordinator labor) = R$ 1,200–4,000/month per site; R$ 14,400–48,000 annually per site

Erros de Decisão em Alocação de Pessoal de Segurança por Falta de Visibilidade em Conformidade

Estimated 15–25% of corrective remediation costs (R$ 5,000–20,000 per site) due to late detection; lost productivity from emergency re-training (10–20 hours per incident × R$ 60–100/hour = R$ 600–2,000 per incident)

Multas por Erro ou Omissão de Retenção de INSS na Construção Civil

R$15,000–50,000 per non-compliant project; additional 75% penalty on unpaid withholding amounts (Lei 10.833/03); joint and several liability exposure unlimited

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence