🇧🇷Brazil

Multas por Não Conformidade com Normas Regulamentadoras (NRs) de Segurança

2 verified sources

Definition

Brazilian construction firms must comply with 28 Normas Regulamentadoras (NRs) established by CLT (Consolidação das Leis do Trabalho). Failure to maintain proper safety inspection records, exposure assessments, and medical surveillance programs triggers MTE fines and can result in work stoppage orders.

Key Findings

  • Financial Impact: R$ 50,000–250,000 per audit cycle (estimated); 20–40 hours/month manual compliance documentation
  • Frequency: Annual or bi-annual MTE audits; ongoing monthly documentation burden
  • Root Cause: Manual tracking of safety inspections, medical exams, and exposure records across multiple workers; lack of centralized compliance verification system

Why This Matters

The Pitch: Nonresidential construction firms in Brasil waste R$ 50,000–250,000 annually on safety inspection non-compliance penalties and corrective audits. Automation of inspection documentation and compliance verification eliminates audit risk.

Affected Stakeholders

Safety Manager, HR/Payroll, Project Manager, Site Supervisor

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Desperdício de Horas de Trabalho em Inspeções Manuais e Documentação de Conformidade

20–40 hours/month per active site × R$ 60–100/hour (Safety Manager/Coordinator labor) = R$ 1,200–4,000/month per site; R$ 14,400–48,000 annually per site

Erros de Decisão em Alocação de Pessoal de Segurança por Falta de Visibilidade em Conformidade

Estimated 15–25% of corrective remediation costs (R$ 5,000–20,000 per site) due to late detection; lost productivity from emergency re-training (10–20 hours per incident × R$ 60–100/hour = R$ 600–2,000 per incident)

Perda de Cobertura de Garantia por Falha em Documentação de Manutenção

Estimated R$ 50,000–500,000 per project (typical medium-sized residential/commercial build). Assume 10–20% of warranty-eligible defects go unrecovered due to documentation loss. Annual time cost: 40–60 hours/project for manual maintenance record aggregation and legal proof assembly.

Atraso na Resolução de Reclamações de Garantia e Litígios Resultantes

Estimated R$ 100,000–1,000,000 per year per large property management firm (5–50 properties). Time cost: 20–40 hours per claim × 10–50 claims/year = 200–2,000 hours/year of manual coordination. Average cost per lost claim (forfeiture): R$ 20,000–100,000 depending on defect severity.

Risco de Litígio e Perda de Indenização por Defesa Inadequada de Direitos de Garantia

Estimated R$ 30,000–200,000 loss per disputed claim (settlement haircut + litigation costs). Litigation time: 18–36 months delay in cash recovery. Legal + expert costs: R$ 15,000–50,000 per claim. Annual impact for large property manager: R$ 150,000–500,000 in settlements/haircuts + 500–1,000 hours of legal coordination.

Multas por Erro ou Omissão de Retenção de INSS na Construção Civil

R$15,000–50,000 per non-compliant project; additional 75% penalty on unpaid withholding amounts (Lei 10.833/03); joint and several liability exposure unlimited

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence