Perda de Receita por Parada de Turnaround Não Otimizada
Definition
Refinery turnaround planning in Brasil currently relies on manual spreadsheet-based scenario modeling and trial-and-error methods. Search results indicate that Revap (252,000 barrels/day capacity, ~14% of Petrobras output) executes 6-yearly shutdowns requiring 4-month mobilization. Each day of unnecessary shutdown equals ~252,000 barrels × R$ 3-5/barrel margin = R$ 756M-1.26B annual forgone revenue per refinery. Manual planning delays decision-making by weeks, pushing shutdowns into suboptimal seasonal windows with worse margin conditions.
Key Findings
- Financial Impact: R$ 100-500M per refinery annually (estimated based on 5-10 day optimization window × production capacity × refined product margins). Revap case: R$ 1B shutdown investment + 4-month production loss recovery = ~R$ 2-3B annual impact across turnaround cycle.
- Frequency: Every 6 years (mandatory NR-13 inspection cycle), but planning decisions made monthly; quarterly re-scheduling adds cumulative inefficiency
- Root Cause: Manual maintenance interval optimization using spreadsheets; lack of real-time production interdependency modeling; trial-and-error scheduling of 1,600+ equipment units and multiple unit groups
Why This Matters
The Pitch: Brazilian refineries waste R$ 100-500M annually per facility due to unoptimized turnaround scheduling. Automation of maintenance interval planning and conflict resolution eliminates manual delays and compresses shutdown windows by 10-20%, recovering 5-10 production days per cycle.
Affected Stakeholders
Refinaria Operations Manager, Maintenance Planning Engineer, Production Scheduler, Turnaround Project Manager
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Get Solutions for This Problem
Full report with actionable solutions
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Evidence Sources:
Related Business Risks
Sobrecusto em Mão de Obra e Recursos Devido a Planejamento Manual
Multas Potenciais por Não Conformidade com NR-13 e Atrasos em Inspeção
Erros de Planejamento Estratégico por Falta de Visibilidade em Dados Integrados
Multas Ambientais e Administrativas por Não Conformidade Operacional
Custos de Remediação e Descomissionamento Obrigatório Não Previstos
Multas por Não Conformidade em Relatórios de Emissões de Carbono
Request Deep Analysis
🇧🇷 Be first to access this market's intelligence