🇧🇷Brazil

Multas por Não Conformidade em NRs na Fabricação de Robôs

1 verified sources

Definition

In robot manufacturing, Engineering BOM Management must ensure compliance with 35 active NRs, including NR-10 (electrical), NR-12 (machinery safety), requiring risk assessments and certifications. Errors cause fines, shutdowns.

Key Findings

  • Financial Impact: R$50,000+ per violation in fines, activity shutdowns costing 20-40 hours rework per incident
  • Frequency: Per non-compliant machine or audit failure
  • Root Cause: Manual BOM lacking NR traceability, leading to design non-compliance

Why This Matters

The Pitch: Robot manufacturing wastes R$100,000+ annually on NR fines and rework. Automation of BOM compliance checks eliminates this risk.

Affected Stakeholders

Engenheiros de Produto, Gerentes de Manufatura, Auditores de Segurança

Deep Analysis (Premium)

Financial Impact

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Current Workarounds

Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.

Unlock to reveal

Get Solutions for This Problem

Full report with actionable solutions

$99$39
  • Solutions for this specific pain
  • Solutions for all 15 industry pains
  • Where to find first clients
  • Pricing & launch costs
Get Solutions Report

Methodology & Sources

Data collected via OSINT from regulatory filings, industry audits, and verified case studies.

Evidence Sources:

Related Business Risks

Penalidades INMETRO por Certificação em Componentes de Robôs

R$100,000+ in penalties and lost sales per non-compliant batch

Retrabalho por Falhas NR em Gestão de BOM

R$20,000-50,000 per rework incident, plus 30% hazard pay premiums

Custos Extras por Adaptações NR em BOM de Robôs

R$50,000-150,000 per robot model in redesign and certification delays

Risco de Penalidades por IA em Despacho de Campo (Lei nº 2.338/2023 - Regulação de IA)

Quantified: R$50,000,000 (statutory maximum per infraction); Operational ban on AI system (100% revenue loss if dispatch is AI-dependent); Estimated compliance cost to remediate: R$200,000–R$1,000,000 (algorithmic audit, impact assessment, governance redesign)

Multa por Não Conformidade com NR 12 - Validação Obrigatória e A.R.T.

Direct penalty: Machine sales prohibition and operational shutdown. Indirect: 15-30 business days delay per machine for CREA engineer assessment and A.R.T. issuance; typical CREA assessment cost R$ 2,000-8,000 per machine. Estimated capacity loss: 5-15 units/month × 3-6 month delays in product launches.

Atraso no Lançamento de Produto - Falta de Sincronização entre NR 12 e Certificação ISO/CE

Indirect: 60-120 calendar days product launch delay × 2-4 lost sales units/month = 10-40 units lost per quarter. Estimated value loss R$ 300,000-2,000,000 per delayed product line (assuming R$ 30,000-100,000 per collaborative robot unit). Manual compliance coordination overhead: 40-60 hours/month of engineering time (R$ 8,000-15,000/month).

Request Deep Analysis

🇧🇷 Be first to access this market's intelligence