🇧🇷Brazil
Penalidades INMETRO por Certificação em Componentes de Robôs
1 verified sources
Definition
Robot BOMs with non-INMETRO certified parts (electronics, motors) face import/export penalties and market bans.
Key Findings
- Financial Impact: R$100,000+ in penalties and lost sales per non-compliant batch
- Frequency: Por importação ou lançamento sem certificação
- Root Cause: BOM engineering sem rastreio INMETRO
Why This Matters
The Pitch: Fabricantes perdem R$500,000/ano em bloqueios INMETRO. Automação BOM assegura conformidade pré-lançamento.
Affected Stakeholders
Gerentes de Importação, Engenheiros Elétricos
Deep Analysis (Premium)
Financial Impact
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Unlock to reveal
Current Workarounds
Financial data and detailed analysis available with full access. Unlock to see exact figures, evidence sources, and actionable insights.
Unlock to reveal
Get Solutions for This Problem
Full report with actionable solutions
$99$39
- Solutions for this specific pain
- Solutions for all 15 industry pains
- Where to find first clients
- Pricing & launch costs
Methodology & Sources
Data collected via OSINT from regulatory filings, industry audits, and verified case studies.
Evidence Sources:
Related Business Risks
Retrabalho por Falhas NR em Gestão de BOM
R$20,000-50,000 per rework incident, plus 30% hazard pay premiums
Multas por Não Conformidade em NRs na Fabricação de Robôs
R$50,000+ per violation in fines, activity shutdowns costing 20-40 hours rework per incident
Custos Extras por Adaptações NR em BOM de Robôs
R$50,000-150,000 per robot model in redesign and certification delays
Risco de Penalidades por IA em Despacho de Campo (Lei nº 2.338/2023 - Regulação de IA)
Quantified: R$50,000,000 (statutory maximum per infraction); Operational ban on AI system (100% revenue loss if dispatch is AI-dependent); Estimated compliance cost to remediate: R$200,000–R$1,000,000 (algorithmic audit, impact assessment, governance redesign)
Multa por Não Conformidade com NR 12 - Validação Obrigatória e A.R.T.
Direct penalty: Machine sales prohibition and operational shutdown. Indirect: 15-30 business days delay per machine for CREA engineer assessment and A.R.T. issuance; typical CREA assessment cost R$ 2,000-8,000 per machine. Estimated capacity loss: 5-15 units/month × 3-6 month delays in product launches.
Atraso no Lançamento de Produto - Falta de Sincronização entre NR 12 e Certificação ISO/CE
Indirect: 60-120 calendar days product launch delay × 2-4 lost sales units/month = 10-40 units lost per quarter. Estimated value loss R$ 300,000-2,000,000 per delayed product line (assuming R$ 30,000-100,000 per collaborative robot unit). Manual compliance coordination overhead: 40-60 hours/month of engineering time (R$ 8,000-15,000/month).